1. Nowadays, many battery car charging piles are wholesaled by manufacturers, and the wholesale price through manufacturers will be reduced.For operators who want to buy charging piles, it is very cost-effective to wholesale from manufacturers.
2. ATE-8603 switching power supply automatic test system (DC-DC) is suitable for the characteristic test of switching power supply such as AC/DC or DC/DC power supply, adapter, battery charger, etc. It is tailor-made and optimized for standard test items. It has good test performance and meets a large number of Production test requirements.
3. The charging pile detection equipment recommends the XL-942S/943S charging pile on-site characteristic tester, which can meet the test needs of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of the testing items in the acceptance stage and operation stage of the national network. And the equipment is highly integrated and portable.
1. First of all, the AC charging pile test project includes the appearance inspection and functional test of the charging pile. The testers will carefully check the appearance of the charging pile, including the integrity of the shell, whether the connector is intact, whether the display and buttons are normal, etc.
2. Charging pile detection project function test: charging function control test, communication function test, insulation detection function test, vehicle plug locking function test, pre-charging function test.
3. It can provide reliability test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
XL-942S charging pile test equipment cooperates with XL-3603 load to meet the test requirements of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of testing projects in the acceptance stage and operation stage of State Grid Document No. 45.
Reliability can provide some test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
"JJG 1149-2018 Electric Vehicle Non-vehicle Charger Verification Regulations" Test Project. JJG 1148-2018 Electric Vehicle Non-vehicle Charger Verification Procedures" Test Project. GB/T 34651-2017" Conduction Charging Interoperability Test Project.
What is the main test of the charging pile test? What is the main test of the charging pile test? What is the main test of the charging pile test? There are two main directions for charging pile testing, one is the test project of electrical parameters, and the other is the test project of compatibility.
OKX Wallet app download for Android-APP, download it now, new users will receive a novice gift pack.
1. Nowadays, many battery car charging piles are wholesaled by manufacturers, and the wholesale price through manufacturers will be reduced.For operators who want to buy charging piles, it is very cost-effective to wholesale from manufacturers.
2. ATE-8603 switching power supply automatic test system (DC-DC) is suitable for the characteristic test of switching power supply such as AC/DC or DC/DC power supply, adapter, battery charger, etc. It is tailor-made and optimized for standard test items. It has good test performance and meets a large number of Production test requirements.
3. The charging pile detection equipment recommends the XL-942S/943S charging pile on-site characteristic tester, which can meet the test needs of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of the testing items in the acceptance stage and operation stage of the national network. And the equipment is highly integrated and portable.
1. First of all, the AC charging pile test project includes the appearance inspection and functional test of the charging pile. The testers will carefully check the appearance of the charging pile, including the integrity of the shell, whether the connector is intact, whether the display and buttons are normal, etc.
2. Charging pile detection project function test: charging function control test, communication function test, insulation detection function test, vehicle plug locking function test, pre-charging function test.
3. It can provide reliability test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
XL-942S charging pile test equipment cooperates with XL-3603 load to meet the test requirements of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of testing projects in the acceptance stage and operation stage of State Grid Document No. 45.
Reliability can provide some test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
"JJG 1149-2018 Electric Vehicle Non-vehicle Charger Verification Regulations" Test Project. JJG 1148-2018 Electric Vehicle Non-vehicle Charger Verification Procedures" Test Project. GB/T 34651-2017" Conduction Charging Interoperability Test Project.
What is the main test of the charging pile test? What is the main test of the charging pile test? What is the main test of the charging pile test? There are two main directions for charging pile testing, one is the test project of electrical parameters, and the other is the test project of compatibility.
Binance app download Play Store
author: 2025-01-10 11:46129.37MB
Check973.76MB
Check132.35MB
Check196.42MB
Check196.48MB
Check725.95MB
Check637.31MB
Check341.24MB
Check843.85MB
Check793.75MB
Check673.64MB
Check695.49MB
Check539.98MB
Check822.44MB
Check439.37MB
Check182.45MB
Check661.49MB
Check319.17MB
Check716.96MB
Check684.11MB
Check913.98MB
Check657.77MB
Check737.48MB
Check577.47MB
Check192.97MB
Check854.85MB
Check923.76MB
Check766.68MB
Check515.56MB
Check255.37MB
Check446.33MB
Check221.96MB
Check474.34MB
Check275.45MB
Check477.71MB
Check851.74MB
CheckScan to install
OKX Wallet app download for Android to discover more
Netizen comments More
737 生死相依网
2025-01-10 13:59 recommend
1087 徘徊不前网
2025-01-10 12:51 recommend
2589 传风搧火网
2025-01-10 11:57 recommend
1908 贼喊捉贼网
2025-01-10 11:49 recommend
530 言听谋决网
2025-01-10 11:14 recommend